RE: PG&E will shut off power for nearly 800,000 customers starting Wednesday
10-14-2019, 10:04 PM
10-14-2019, 10:04 PM
Really, if you have a solar power system that's tied into the local grid, just about everything is there already. Except that the kind of integrated use of USB 3.1 I brought up isn't present - that would have to be something that's kitbashed together. But the technology is there.
Honestly, with the way I've been seeing USB charging ports popping up everywhere there's a 120v AC outlet, I think it'd be only a matter of time before it happens.
Honestly, with the way I've been seeing USB charging ports popping up everywhere there's a 120v AC outlet, I think it'd be only a matter of time before it happens.